Skip to content
Brentwood Inspection

Inspection service

PCAR Inspection

Property Condition Assessment Reports following ASTM E2018 practice — site, structure, envelope, MEP and life-safety — with cost tables for immediate and reserve needs.

What is included

  1. 1 ASTM E2018-aligned walk-through survey
  2. 2 Document review and interviews with site staff
  3. 3 Building systems condition and remaining useful life
  4. 4 Immediate and short-term cost tables
  5. 5 10–12 year capital reserve schedule
  6. 6 Lender and carrier-ready PCAR report

Other inspection services

Ready to scope your inspection?

Tell us about the property and we will send a tailored proposal — usually within one business day.